title: HydroGraph (Manhattan, KS) description: “CSE/TSXV graphene via detonation (Hyperion). ~10 t per reactor in company copy.” tags:
- manufacturing
Evidence: company notices and facility address. Texas scale-up is planned, not a finished mill until they say it is running.
Parent: directory
Site
HydroGraph Clean Power. Vancouver office. Production: 809 Levee Dr h, Manhattan, KS 66502. ~13,000 sq ft plant language from the 2022 opening note. Process: licensed KSU detonation / “explosion synthesis”; Hyperion reactors (~6×6×18 ft in the 2026 scale-up note).
Capacity the company states
- First commercial unit (May 2023 in a later circular): minimum 10 t/year.
- 27 Jan 2026: two more Hyperion units, ~10 t/year each of FGA-1 fractal graphene; commission in Manhattan then move toward Austin / south Texas. Bellville, TX acetylene + land agreements in a 2026 circular — planned large site, not a second operating mill on this page yet.
Sparc coatings tests belong on the order row, not here.